BIM & Digital Engineering
BIM Material Take-Offs, BOQ, 4D & 5D
Model-based quantities and BOQ development with 4D sequencing and 5D cost-loaded studies, kept consistent with every model revision.
Capabilities
- Extraction of accurate model-based material quantities and measurable construction components directly from coordinated BIM disciplines
- Preparation of structured material take-off schedules converted into project BOQ formats aligned with consultant/client commercial requirements
- Classification, filtering, and package-wise segregation of quantities to support tendering, procurement planning, and cost verification
- Continuous BOQ quantity updates linked with model revisions to maintain commercial consistency
- 4D construction sequencing studies
- 5D cost-loaded studies
- Proper modelling methods adopted to lead accurate and structured material take-offs
Selected work






See BIM Material Take-Offs, BOQ, 4D & 5D inside the full BIMCO experience
Explore our services and projects in an immersive, cinematic walkthrough.
Enter the experience